Originally Posted by
johnyboy
> one problem that comes up every so often is when I have a customer that is not very good at describing what they want.
what about, especially if it looks a potentially sizable job, splitting it into two phases?; planning then production. and charge separetely for the two phases. say to them you'll charge roughly x for the first phase. at the end of the first phase present one, two or three rough plans/sketches of possible sites each with a rough price attached to them. they pick/modify, then move into phase two, production. all the time basically charging by the hour.